Made from self-extinguishing synthetic materials.
Composition:
– 1 three-phase cutout box equipped with 4 CPF units with flexible cables 16 mm² connecting the CPF and the meter,
– 1 chamber with backboard (class 2),
– 1 removable board with holes for mounting a CBE or Linky meter, a circuit-breaker and slotted holes for wiring the devices,
– 4 flexible cables 16 mm² for connecting meter/circuit-breaker.
CPF connectors
Designed to receive incoming cables from the top or from the bottom. Insulation piercing IP2X connectors with breakable head. They include 16 mm² copper connections to connect either a CBE meter or a Linky meter.
Connection capacities of incoming cables:
– conductors with stranded copper or aluminium core: 10 to 35 mm²,
– conductors with solid aluminium core: 16 to 35 mm².
Standards
Complies with the new Enedis-CPT-M&SSpe-13006A specification (replaces the specifications HN 62-S-80 and HN 62-S-81).
Complies with standards NF C 14-100 and NF C 15-100 as well as the requirements of Class 2 defined in NF C 20-030.