Standards
In compliance with standard NF ISO 8099-2000 relating to waste water from on-board sanitary facilities.
Application
The pumping station is supplied with a suction pipe with a length of 7.5, 10 or 15 m as standardand a suction coupling according to ISO standard 8099. The pumping station is mounted on the ground with 4 x 10 mm diameter stainless steel bolts (not supplied).
To obtain the best use from your installation, contact our services to design the layout.
Installation
In a fixed installation, the waste water must be discharged either directly into the private or public waste water or sewage system or into a waste water storage tank.
An oil separator must be installed on bilge water extraction systems before discharging it into the public sewage system. Under no circumstances must a shut-off valve be installed on the discharge circuit.
Self-priming diaphragm pump. Dry-running.
Polished 316 L stainless steel enclosure (mirror finish).
Maximum horizontal discharge length: 120 m
Maximum suction head: 6 m
Maximum discharge head: 15 m
Hose length: 7.5 m
Motor: 230 V, 750 W
Weight: 95 kg